E2 Test Update

E2 Test Update

The test program is progressing right on schedule, both on the ground and in the air. Static tests started on November 24 on a specially-built E2 that has the wings of an E190-E2 and the fuselage of an E195-E2. Since then, another full-scale prototype has been positioned at the Eugênio de Melo facility alongside the E2 that is used for static tests. This second aircraft, an E190-E2, is for fatigue testing that will begin in the first half of 2017. The test will simulate three times the number of flights in an aircraft’s typical life. In the air, the three E190-E2s that are flying have accumulated more than 300 flight hours.

Continue Reading

A new E2 case study series from Embraer

1 month ago

Embraer’s E-Freighter is Certified by the FAA

Category
Product 2 months ago